Do not be alarmed. No one is injured. Today was a tough day. Simon could not make it as he has come down with the flu. Not surprising considering the cold weather we have had these past weeks.
Ilya arrived at 10.30 and Uwe soon after. The goals today were to load the skip with all of the debris from the chunst. Yes it will be finally gone. The second goal was to demolish the wall between the laundry and guest room as well as the brick shower unit, and the third goal was to remove the upstairs combination boiler, cooker- sink unit. Reggie and Raphael supplied hot coffee and sandwiches.
Ilya tackled the upstairs unit on his own, and Uwe and myself tackled the debris. We managed our component by 13.30 when we all knocked off for lunch. Uwe had the bright idea to take the scrap metal to the scrap metal bin in village on the way to lunch. This we did, and then settled into a lovely lunch (cooked by Reggie)of risotto veggies and stew on the menu. After a couple of pain killers (glasses of wine) we headed back to work.
Ilya continued upstairs with great success and Uwe and myself continued with the demolition and debris removal tasks. We all completed our jobs as the light started to fail. The skip holds 7 tons, and it is full to the brim. We will sleep well tonight for sure.
A huge thanks to Ilya and Uwe. And Simon. Do not worry there is lots more to do.