Well they aren't actually, but the work that is being carried out at the moment should keep us toasty warm during the future cold spells. The underfloor warm water system is being installed and the top scree coat should go in on Monday morning next week. It will take three days to go off, before we can walk on it.
We are still in discussion about tiles for the hallway, kitchen and bar area. We know that we need a light coloured tile, but are unsure how the effect will be, when we match them to the kitchen.
We have a huge morning of meetings next Thursday at which we will meet the tile layer, stairs builder, plasterer, door and frame installer, all at various times during the morning. This should be great as these are the guys who will be finishing the jobs that will make our project look like a house.