Well we are really getting on top of the huge green beast. It really has been hard work, with the incredibly hard stones that have been baked even harder. Another week or so and it should be gone. We have decided to call in a skip, so that I can offload the rubble out of the window and directly into it.
It is incredible how the soot travels through your clothing turning everything black. I managed to scare the neighbor when I returned home today.
Well what else has happened this week? The fact that I am now back in the office has slowed us down, but we still managed to get the 380 volt supply wired in, along with some high amp 230 V.
This morning we have received another set of drawings from the architect, and we will be meeting in the week of Jan 26th. This should see us pretty close to final layout and ideas.
Tonight we will take a long look at these when the prince is asleep.
No comments:
Post a Comment