Today has been interesting thus far. We completed the wall scraping from the great wall, and this was followed by the cutting of the floor in the workshop. The hole has to be created to accept the stairs that will be relocated from the first to second floor (these are being replace with much nicer open stairs).
Chainsaws always phase me a little. I think it is the length of the exposed spinning blade and the noise that does it, oh yes and the method of starting them. Anyway I plucked up the courage, but before cutting the hole I had to pop up into the roof of the workshop and remove quite a few roof tiles(we have stacks of these all over the house).
The job took a few minutes to complete, but it left me filthy dirty with dirt and old dust, as well as sawdust.
The tiling from yesterday is but a distant memory. I now need to turn my hand to tile cutting. The cellar, come laundry, does not have a 90 degree angle between any of the walls. This will necessitate lots of cutting.
The plasterers are still working their way around the house. The quality of their work is superb.
I must now get cleaned up before the architect arrives to discuss the budget. This should be a fun meeting.
No comments:
Post a Comment