More progress. The plasters continue to ply their trade with many finishing off tasks. The tile layer has been laying tiles in the main en-suite. These are the tiles that we had so much anxiety over. We have been rather bold and daring with the design, and so far we are both happy with the outcome. I will post some more pictures of this bathroom tomorrow when more progress will have been made.
The kitchen will be delivered next Friday, so it is imperative that the front and back door are sanded and lacquered and re-located before then. I have spent some time this week working on the front door. One side is complete, and the easier back-side will be completed on Friday. The back door will just get a touch up. The front door is a lovely oak structure which just need some TLC to give it a longer life.
The natural stone wall will be attacked again on Saturday. The pointing is not difficult, but it is time consuming.
If the sun is shining on Friday I will apply the bitumen to the garage roof. This task, I have been putting off for a while, but now the weather is turning, I need to get it done.
More pics tomorrow...
No comments:
Post a Comment